Metaltec Consultancy And Services Vadodara Contact Us project management services Plant construction
About Us Design & Engineering Services Procurement Management Projects Executed Project Management Geological Services Marketing Profile of Promoters
Consultancy Services for Zinc,Tin, Nickel, Cobalt
 
metal consultant   copper Cathode
 
Instrumentation Consultant
project management services

Since inception ,the major Assignments executed by us are:

Conceptualization of Enriched Purification Cake process at Zinc Smelter of Hindustan Zinc Ltd., Chanderiya to recover Copper cake, Cadmium Sponge and Zinc Sulphate solution involving two stage Leaching & filtration

Basic & Detailed engineering of Anode Mud Treatment Plant for Hindustan Zinc Ltd., Chanderiya wherein Anode mud (generated in Cell House ) is leached with Sulphur-di-oxide gas to recover Lead-Silver Cake and Manganese Sulphate solution

Basic & Detailed engineering of HGP Dust Leaching & filtration Plant for Hindustan Zinc Ltd., Chanderiya to recover Lead-Silver cake and Zn-Cd-Mn bearing solution. The Plant has been successfully commissioned in mid 2013

Preparation of Prefeasibility /Feasibility Report for Tin Smelting , Copper Concentrator, Copper Smelter & Refinery and Zinc Oxide from EAF Dust

Basic & Detailed engineering for Solvent Extraction Plant for 6000 TPA Copper Cathode in Democratic Republic of Congo for Golden Africa Sprl. The Plant has been successfully commissioned in 2013

Basic & Detailed engineering, Procurement assistance and Project management services for a Copper refinery in Sri Lanka for S.R. Metals. Plant has been successfully commissioned in 2014

Design & preparation of fabrication drawings for Bus Bar system of Copper Refinery, Sri Lanka

Procurement & Supply of complete Instrumentation Package for Copper Refinery of S.R Metals, Sri Lanka.

Health study of Jhagadia Copper Ltd. for Hindustan Copper Ltd.(A Govt. of India Undertaking), Kolkata

Consultant for refurbishment of Gujarat Copper Project, Jhagadia, Bharuch by Hindustan Copper Ltd. (A Govt. of India Undertaking) for all Plants/Facilities from Anode Furnace to Refinery including ETP, Plant & Yard piping and Utilities such as DM Plant , Propane Storage, Boilers, LDO/FO Storage, Compressed Air, Cooling Tower & Fire Hydrant System.

Prepared Piping layout alongwith material take - off and cost estimate for Compressed air piping for LM Wind Power, Halol

Structural analysis and foundation design for "Auto- Stripping machine " at Zinc Smelter ,Debari of Hindustan Zinc Ltd.

Health Study of "Dust Extraction System" for Gujarat Fluorochemicals Limited, Dahej

Process conceptualisation and Project Report preparation for Nickel & Cobalt Metal and Salts Project of K.R Shree Laxmi, Kolkata.

 

 

 
Turnkey Project   Plant construction
 
About Us | Design & Engineering Services | Procurement Management | Projects Executed | Project Management | Geological Services | Marketing | Profile of Promoters | Contact Us
 
copper metallurgy
© Copyright 2011 METALTEC. All Rights Reserved. Twitter Myspace Facebook Linkedin Designed by :: Creative Web Solutions
copper plant consultant